ERP and MRP implementation consultant for UK manufacturers

Select, design and deliver an ERP that fits how you make product. Or rescue the one that is not working.

Why do manufacturing ERP projects go wrong?

Manufacturing ERP projects usually fail because the system is configured around an unstable, undocumented process. Inaccurate bills of materials, routings and stock records, unclear ownership and requirements written from a vendor demo are the common causes, not the software itself.

An ERP does not fix how work flows. It records and plans it. If planning rules, lead times and routings are wrong, the system produces confident wrong answers faster. That is why our implementation work follows an operations assessment and process stabilisation.

  • Requirements written from the floor, not from a feature list
  • Master data cleaned before migration, not after go-live
  • A named owner on the business side, not only the IT side
  • Benefits tracked against baselines you measured before the project
How master data feeds MRP planning, works orders and the shop floor, with actuals feeding back Master data: fix first Bills of materials Routings and lead times Stock records MRP planning Works orders Shop floor Actual quantities, scrap and times flow back and correct the master data
Master data drives every plan the ERP produces. Errors in it flow through to every works order.

Where we help in the ERP lifecycle

Before you buy

Process baseline, requirements, vendor longlist and shortlist, demo scripts built around your products, and a business case.

During implementation

Process design, master data readiness, vendor oversight, testing and go-live planning. Delivery experience includes Oracle NetSuite for manufacturing.

When it is not working

Independent review of a stalled or live system, root-cause of the gaps, and a recovery plan with the vendor and your team.

What to check before you choose a manufacturing ERP

AreaQuestion to ask
Fit to your processDoes it handle your make-to-order or make-to-stock reality, variants and subcontracting without custom code?
PlanningCan MRP use your real lead times, yields and capacity, and who maintains them?
Shop-floor dataHow are job progress, scrap and downtime captured without re-keying?
Quality and traceabilityDoes it support lot and serial traceability, NCRs and the audits your customers require?
Total costLicences, implementation, data migration, training and ongoing support over five years
Vendor deliveryNamed UK manufacturing references and who actually does the implementation

ERP for manufacturers: your questions

What does an ERP implementation consultant do for a manufacturer?

An ERP implementation consultant defines requirements, helps select the system, designs the future process, prepares data, oversees the vendor and supports testing and go-live. An independent consultant keeps scope, cost and benefits honest on your behalf.

What is the difference between ERP and MRP?

MRP plans material requirements and production from demand, bills of materials and stock. ERP is wider: it adds finance, sales, purchasing, quality and more in one system. Many manufacturers implement MRP functions first inside an ERP.

How long does a manufacturing ERP implementation take?

It depends on scope, data quality and the number of sites. The most reliable way to shorten it is to stabilise processes and clean master data before the project starts.

Can you rescue a failing ERP project?

Yes. We review what was built against how the factory actually works, identify the root causes, and agree a recovery plan with your team and vendor.