Manufacturing consulting case studies

Measured outcomes from UK manufacturing sites. Client names are withheld where agreements require.

MN Consultants case studies show measured results from UK manufacturers: £700K of cost of poor quality removed across four sites, right-first-time raised from 70% to 99.8%, £272K of annual savings with no job losses, and a £3.5M automation project delivered on time and in scope.

Right-first-time rose from 70 percent to 99.8 percent at a pump manufacturer Right-first-time, pump manufacturer Before70% After99.8% Bar length proportional to percentage
Right-first-time at a pump manufacturer before and after the improvement programme.
£700Kcost of poor quality eliminated

PE-backed manufacturer, four sites

Challenge: high cost of poor quality across four production sites.

Result: £700K of cost of poor quality eliminated and right-first-time at 99.8% across all sites.

70% to 99.8%right-first-time

Pump manufacturer

Challenge: right-first-time was around 70%.

Result: right-first-time rose from 70% to 99.8%.

£272Kannual savings

High-volume automotive supplier

Challenge: cost pressure on two lines in a demanding OEM supply chain.

Result: a structured process review found £162K and £110K of annual savings across the two lines, with no job losses.

12%productivity uplift

NHS Tier 1 fire door supplier

Challenge: long lead times and an unaddressed scheduling problem.

Result: 12% productivity improvement by removing non-value-adding steps and unnecessary handling, with zero redundancies.

3xassembly throughput

Modular construction manufacturer

Challenge: assembly throughput below target.

Result: assembly throughput tripled.

£3.5Mcapex automation, on time

Automation capex programme

Challenge: justify, specify and deliver a major automation investment.

Result: a £3.5M automation project delivered on time and in scope, and £45K of customer penalty charges avoided through capacity optimisation.

Case studies: your questions

What results has MN Consultants delivered for manufacturers?

Documented results include £700K of cost of poor quality eliminated across four sites, right-first-time up from 70% to 99.8% at a pump manufacturer, £272K of annual savings at an automotive supplier, a 12% productivity gain at an NHS Tier 1 supplier, tripled assembly throughput, and a £3.5M automation project delivered on time.

Why are client names withheld?

Client names are withheld where confidentiality agreements require. The figures describe real sites and are measured on the client's own floor.

Did the savings involve job losses?

No. The automotive supplier savings and the NHS Tier 1 productivity gain were achieved with no job losses or redundancies, by removing waste, unnecessary handling and non-value-adding steps.

How do I find out what an assessment could find at my site?

Book a call. A manufacturing operations assessment is a two-week on-site diagnostic that produces a scored baseline and a costed action plan.

What could an assessment find on your floor?

Most diagnostics identify recoverable value before any capital spend.