What we do
- Observe the process on the floor, start to finish
- Baseline cost of poor quality, rework and scrap
- Value stream map with waiting and handling quantified
- Opportunity register ranked by payback and effort
Manufacturing Consultant UK
The cost is rarely in the people. It is in the process. Find it, price it and fix the biggest items first.
To reduce manufacturing costs without cutting headcount, measure where the process loses time, material and quality, put a pound value on each loss, and fix the largest first. The savings usually sit in waiting, rework, excess inventory, unnecessary movement and overprocessing, not in wages.
Cutting people lowers cost for a quarter and removes the capacity and know-how you need when volume returns. Fixing the process lowers cost permanently.
At a high-volume automotive supplier, a structured process review found £162,000 and £110,000 of annual savings on two separate lines. At an NHS Tier 1 supplier, removing non-value-adding steps and fixing a scheduling problem lifted productivity by 12%. Nobody lost their job in either case.
The same categories recur in almost every site we assess.
| Waste | What it looks like | Typical lever |
|---|---|---|
| Waiting | Machines and people idle between steps | Balance flow, fix scheduling |
| Defects and rework | Paid twice: once to make, once to fix | Error-proofing, FMEA, right-first-time |
| Excess inventory | Cash tied up in stock and WIP | Pull signals, reorder rules, stock accuracy |
| Transport and motion | Material and people travelling further than needed | Layout and flow redesign |
| Overprocessing | Doing more to a part than the customer needs | Review specification and inspection steps |
| Overproduction | Making ahead of demand | Level the schedule to real orders |
It depends on the site. Our diagnostics have typically identified £80K to £300K of recoverable value without capital spend, and engagements have found savings from roughly £100,000 to over £700,000 a year. The figure only means something once measured on your floor.
Yes. Most savings come from process waste. The same team produces more at lower cost when the system stops working against them.
Quick wins often appear within weeks of the assessment. Larger savings from flow, quality and systems take longer and are sequenced by payback.
Cost reduction is the outcome. The operations assessment is the method that finds and prices the opportunities.
Tell us about your site and we will say plainly whether a review is worth doing.
Manufacturing operations assessment and digitalisation for UK manufacturers. Led by a chartered engineer. Stabilise first, then automate.